FROM PROJECT BRIEF TO PROJECT INTELLIGENCE

Connect Every Piece of Your Construction Project Record

GB Intel connects CPM schedules, procurement trackers, FIDIC contracts, and risks to continuously tell you what changed, why it changed, what it means, and what action is required.

Native Integrations:Oracle Primavera P6 (.xer/.xml)Microsoft ProjectFIDIC / NEC4 / JCTSCL Delay Protocol
Core Architecture

The GB Intel Intelligence Chain

Construction projects generate massive amounts of fragmented data. GB Intel converts disparate records into an interconnected permanent memory chain.

01EventWhat happened & Why
02CPM ImpactCritical path shift
03RiskExposure & Score
04ContractFIDIC Notice & EOT
05ActionMitigation tasks
06DecisionManagement rulings
07OutcomePermanent memory
Two-Sided Platform

Neutral Project Intelligence for Both Sides

GB Intel is neutral to the user’s position. The same underlying CPM, and contract engine powers both contractor claim generation and client forensic analysis.

Contractor EOT Claim Generator

Monitor → Identify → Analyse → Build → Support → Submit

Entitlement Builder
1. Contemporaneous Record Mapping

Links RFI-042, Site Instruction SI-019, and manufacturer notices directly to CPM schedule activities.

2. Critical Path Impact Calculation

Automatically runs Time Impact Analysis (TIA) against the locked control baseline.

3. Contractual Notice Timers

Tracks 28-day notice condition precedent under FIDIC Sub-Clause 20.1 to avoid time-barring.

4. Ready-to-Submit Claim Dossier

Exports narrative report, impacted schedule, and hyperlinked records for Engineer submission.

Comprehensive Platform

The 11 Core Modules of GB Intel

Everything needed to govern a multi-million dollar capital project lifecycle from initial brief to permanent project history.

01

Project Setup & AI Briefs

Generate complete WBS and CPM schedules from structured project brief questions or import existing data.

02

Programme CPM Engine

Import Oracle P6 (.xer/.xml) or MSP. Establish control baselines, lock approvals, and compare monthly updates.

03

Procurement Intelligence

Connect long-lead items (generators, chillers, elevators) directly to programme activities with critical path exposure.

04

Event & Change Intelligence

Log delay events, answer Why did it change?, link affected activities, and calculate programme consequences.

05

Contract & FIDIC Engine

Clause parser for FIDIC, NEC4, and JCT. Automatically tracks notice deadlines and EOT contractual provisions.

06

Two-Sided Claims & Forensic Hub

Contractor EOT claim builder plus Client forensic delay analyzer with concurrent delay calculations.

07

Living Dynamic Risk Register

Self-updating risk register with 5x5 matrix and cost/time exposure automatically generated from delay events.

08

Project Memory & Chronology

Permanent interconnected audit timeline proving who decided what, why, and what actually occurred.

09

Executive Intelligence Summaries

Weekly Monday Morning intelligence briefings for Directors, Project Managers, and Commercial Leads.

Dynamic Pricing Architecture

Priced Around Project Value & Intelligence Depth

Not priced by the number of user seats. All stakeholders collaborate within one connected environment.

PROJECT EXPOSURE CALCULATOR

Calculate Your Delay Risk Exposure

Estimate how much unmanaged delay and missed contractual notice deadlines could cost your project.

Project Contract Value:$100M USD
$10M$250M$500M
Potential Unsubstantiated Delay:24 Calendar Days
5 Days45 Days90 Days
Liquidated Damages (LDs)$360,000
Prolongation Overhead Risk$300,000
Total Project Exposure$660,000

GB Intel connects your programme, contract, and project records for a fraction of a single day’s delay exposure.