GB Intel connects CPM schedules, procurement trackers, FIDIC contracts, and risks to continuously tell you what changed, why it changed, what it means, and what action is required.
Construction projects generate massive amounts of fragmented data. GB Intel converts disparate records into an interconnected permanent memory chain.
GB Intel is neutral to the user’s position. The same underlying CPM, and contract engine powers both contractor claim generation and client forensic analysis.
Monitor → Identify → Analyse → Build → Support → Submit
Links RFI-042, Site Instruction SI-019, and manufacturer notices directly to CPM schedule activities.
Automatically runs Time Impact Analysis (TIA) against the locked control baseline.
Tracks 28-day notice condition precedent under FIDIC Sub-Clause 20.1 to avoid time-barring.
Exports narrative report, impacted schedule, and hyperlinked records for Engineer submission.
Everything needed to govern a multi-million dollar capital project lifecycle from initial brief to permanent project history.
Generate complete WBS and CPM schedules from structured project brief questions or import existing data.
Import Oracle P6 (.xer/.xml) or MSP. Establish control baselines, lock approvals, and compare monthly updates.
Connect long-lead items (generators, chillers, elevators) directly to programme activities with critical path exposure.
Log delay events, answer Why did it change?, link affected activities, and calculate programme consequences.
Clause parser for FIDIC, NEC4, and JCT. Automatically tracks notice deadlines and EOT contractual provisions.
Contractor EOT claim builder plus Client forensic delay analyzer with concurrent delay calculations.
Self-updating risk register with 5x5 matrix and cost/time exposure automatically generated from delay events.
Permanent interconnected audit timeline proving who decided what, why, and what actually occurred.
Weekly Monday Morning intelligence briefings for Directors, Project Managers, and Commercial Leads.
Not priced by the number of user seats. All stakeholders collaborate within one connected environment.
Estimate how much unmanaged delay and missed contractual notice deadlines could cost your project.
GB Intel connects your programme, contract, and project records for a fraction of a single day’s delay exposure.